Vulnerabilidades do Oracle Primavera Gateway
🔔 Criar alerta RSS Verificador de versão
CVEs publicadas que afetam Oracle Primavera Gateway: 29 registro(s), com versões afetadas e correções.cpe:2.3:a:oracle:primavera_gateway
CVE-2018-15756
Alta · 7.5
18/10/2018
DoS Attack via Range Requests
Spring Framework, version 5.1, versions 5.0.x prior to 5.0.10, versions 4.3.x prior to 4.3.20, and older unsupported versions on the 4.2.x branch provide support for range requests when serving static resources through the ResourceHttpRequestHandler, or starting in 5.0 when an annotated controller returns an org.springframework.core.io.Resource. A malicious user (or attacker) can add a range header with a high number of ranges, or with wide ranges that overlap, or both, for a denial of service attack. This vulnerability affects applications that depend on either spring-webmvc or spring-webflux. Such applications must also have a registration for serving static resources (e.g. JS, CSS, images, and others), or have an annotated controller that returns an org.springframework.core.io.Resource. Spring Boot applications that depend on spring-boot-starter-web or spring-boot-starter-webflux are ready to serve static resources out of the box and are therefore vulnerable.
CVE-2018-1257
Média · 6.5
11/05/2018
Spring Framework, versions 5.0.x prior to 5.0.6, versions 4.3.x prior to 4.3.17, and…
Spring Framework, versions 5.0.x prior to 5.0.6, versions 4.3.x prior to 4.3.17, and older unsupported versions allows applications to expose STOMP over WebSocket endpoints with a simple, in-memory STOMP broker through the spring-messaging module. A malicious user (or attacker) can craft a message to the broker that can lead to a regular expression, denial of service attack.
CVE-2018-1270
Crítica · 9.8
CWE-94 06/04/2018
Code Injection em Vmware Spring Framework
Spring Framework, versions 5.0 prior to 5.0.5 and versions 4.3 prior to 4.3.15 and older unsupported versions, allow applications to expose STOMP over WebSocket endpoints with a simple, in-memory STOMP broker through the spring-messaging module. A malicious user (or attacker) can craft a message to the broker that can lead to a remote code execution attack.
CVE-2017-5645
Crítica · 9.8
Exploit público CWE-502 17/04/2017
Deserialization of Untrusted Data em Apache Software Foundation Log4j
In Apache Log4j 2.x before 2.8.2, when using the TCP socket server or UDP socket server to receive serialized log events from another application, a specially crafted binary payload can be sent that, when deserialized, can execute arbitrary code.