CVE Intelligence

Oracle Primavera Gateway vulnerabilities

🔔 Create alert RSS Version checker

Published CVEs affecting Oracle Primavera Gateway: 29 record(s), with affected versions and fixes.
cpe:2.3:a:oracle:primavera_gateway

CVE-2018-15756 High · 7.5 Oct 18, 2018
DoS Attack via Range Requests
Spring Framework, version 5.1, versions 5.0.x prior to 5.0.10, versions 4.3.x prior to 4.3.20, and older unsupported versions on the 4.2.x branch provide support for range requests when serving static resources through the ResourceHttpRequestHandler, or starting in 5.0 when an annotated controller returns an org.springframework.core.io.Resource. A malicious user (or attacker) can add a range header with a high number of ranges, or with wide ranges that overlap, or both, for a denial of service attack. This vulnerability affects applications that depend on either spring-webmvc or spring-webflux. Such applications must also have a registration for serving static resources (e.g. JS, CSS, images, and others), or have an annotated controller that returns an org.springframework.core.io.Resource. Spring Boot applications that depend on spring-boot-starter-web or spring-boot-starter-webflux are ready to serve static resources out of the box and are therefore vulnerable.
CVE-2018-1257 Medium · 6.5 May 11, 2018
Spring Framework, versions 5.0.x prior to 5.0.6, versions 4.3.x prior to 4.3.17, and…
Spring Framework, versions 5.0.x prior to 5.0.6, versions 4.3.x prior to 4.3.17, and older unsupported versions allows applications to expose STOMP over WebSocket endpoints with a simple, in-memory STOMP broker through the spring-messaging module. A malicious user (or attacker) can craft a message to the broker that can lead to a regular expression, denial of service attack.
CVE-2018-1270 Critical · 9.8 CWE-94 Apr 6, 2018
Code Injection in Vmware Spring Framework
Spring Framework, versions 5.0 prior to 5.0.5 and versions 4.3 prior to 4.3.15 and older unsupported versions, allow applications to expose STOMP over WebSocket endpoints with a simple, in-memory STOMP broker through the spring-messaging module. A malicious user (or attacker) can craft a message to the broker that can lead to a remote code execution attack.
CVE-2017-5645 Critical · 9.8 Public exploit CWE-502 Apr 17, 2017
Deserialization of Untrusted Data in Apache Software Foundation Log4j
In Apache Log4j 2.x before 2.8.2, when using the TCP socket server or UDP socket server to receive serialized log events from another application, a specially crafted binary payload can be sent that, when deserialized, can execute arbitrary code.