CVE Intelligence

Oracle Primavera Gateway vulnerabilities

🔔 Create alert RSS Version checker

Published CVEs affecting Oracle Primavera Gateway: 29 record(s), with affected versions and fixes.
cpe:2.3:a:oracle:primavera_gateway

CVE-2022-23437 Medium · 6.5 CWE-835 Jan 24, 2022
Infinite loop within Apache XercesJ xml parser
There's a vulnerability within the Apache Xerces Java (XercesJ) XML parser when handling specially crafted XML document payloads. This causes, the XercesJ XML parser to wait in an infinite loop, which may sometimes consume system resources for prolonged duration. This vulnerability is present within XercesJ version 2.12.1 and the previous versions.
CVE-2021-36090 High · 7.5 CWE-130 Jul 13, 2021
Apache Commons Compress 1.0 to 1.20 denial of service vulnerability
When reading a specially crafted ZIP archive, Compress can be made to allocate large amounts of memory that finally leads to an out of memory error even for very small inputs. This could be used to mount a denial of service attack against services that use Compress' zip package.
CVE-2021-21409 Medium · 5.9 CWE-444 Mar 30, 2021
Possible request smuggling in HTTP/2 due missing validation of content-length
Netty is an open-source, asynchronous event-driven network application framework for rapid development of maintainable high performance protocol servers & clients. In Netty (io.netty:netty-codec-http2) before version 4.1.61.Final there is a vulnerability that enables request smuggling. The content-length header is not correctly validated if the request only uses a single Http2HeaderFrame with the endStream set to to true. This could lead to request smuggling if the request is proxied to a remote peer and translated to HTTP/1.1. This is a followup of GHSA-wm47-8v5p-wjpj/CVE-2021-21295 which did miss to fix this one case. This was fixed as part of 4.1.61.Final.
CVE-2021-23337 High · 7.2 Public exploit CWE-94 Feb 15, 2021
Command Injection
Lodash versions prior to 4.17.21 are vulnerable to Command Injection via the template function.
CVE-2020-28500 Medium · 5.3 Feb 15, 2021
Regular Expression Denial of Service (ReDoS)
Lodash versions prior to 4.17.21 are vulnerable to Regular Expression Denial of Service (ReDoS) via the toNumber, trim and trimEnd functions.
CVE-2020-36183 High · 8.1 CWE-502 Jan 6, 2021
Deserialization of Untrusted Data in Fasterxml Jackson-databind
FasterXML jackson-databind 2.x before 2.9.10.8 mishandles the interaction between serialization gadgets and typing, related to org.docx4j.org.apache.xalan.lib.sql.JNDIConnectionPool.
CVE-2020-36189 High · 8.1 CWE-502 Jan 6, 2021
Deserialization of Untrusted Data in Fasterxml Jackson-databind
FasterXML jackson-databind 2.x before 2.9.10.8 mishandles the interaction between serialization gadgets and typing, related to com.newrelic.agent.deps.ch.qos.logback.core.db.DriverManagerConnectionSource.
CVE-2020-36188 High · 8.1 CWE-502 Jan 6, 2021
Deserialization of Untrusted Data in Fasterxml Jackson-databind
FasterXML jackson-databind 2.x before 2.9.10.8 mishandles the interaction between serialization gadgets and typing, related to com.newrelic.agent.deps.ch.qos.logback.core.db.JNDIConnectionSource.
CVE-2020-36187 High · 8.1 CWE-502 Jan 6, 2021
Deserialization of Untrusted Data in Fasterxml Jackson-databind
FasterXML jackson-databind 2.x before 2.9.10.8 mishandles the interaction between serialization gadgets and typing, related to org.apache.tomcat.dbcp.dbcp.datasources.SharedPoolDataSource.
CVE-2020-36186 High · 8.1 CWE-502 Jan 6, 2021
Deserialization of Untrusted Data in Fasterxml Jackson-databind
FasterXML jackson-databind 2.x before 2.9.10.8 mishandles the interaction between serialization gadgets and typing, related to org.apache.tomcat.dbcp.dbcp.datasources.PerUserPoolDataSource.
CVE-2020-36185 High · 8.1 CWE-502 Jan 6, 2021
Deserialization of Untrusted Data in Fasterxml Jackson-databind
FasterXML jackson-databind 2.x before 2.9.10.8 mishandles the interaction between serialization gadgets and typing, related to org.apache.tomcat.dbcp.dbcp2.datasources.SharedPoolDataSource.
CVE-2020-17521 Medium · 5.5 Dec 7, 2020
Apache Groovy provides extension methods to aid with creating temporary directories…
Apache Groovy provides extension methods to aid with creating temporary directories. Prior to this fix, Groovy's implementation of those extension methods was using a now superseded Java JDK method call that is potentially not secure on some operating systems in some contexts. Users not using the extension methods mentioned in the advisory are not affected, but may wish to read the advisory for further details. Versions Affected: 2.0 to 2.4.20, 2.5.0 to 2.5.13, 3.0.0 to 3.0.6, and 4.0.0-alpha-1. Fixed in versions 2.4.21, 2.5.14, 3.0.7, 4.0.0-alpha-2.
CVE-2020-25649 High · 7.5 CWE-611 Dec 3, 2020
XML External Entity (XXE) in Fasterxml Jackson-databind
A flaw was found in FasterXML Jackson Databind, where it did not have entity expansion secured properly. This flaw allows vulnerability to XML external entity (XXE) attacks. The highest threat from this vulnerability is data integrity.
CVE-2020-11979 High · 7.5 CWE-379 Oct 1, 2020
As mitigation for CVE-2020-1945 Apache Ant 1.10.8 changed the permissions of temporary…
As mitigation for CVE-2020-1945 Apache Ant 1.10.8 changed the permissions of temporary files it created so that only the current user was allowed to access them. Unfortunately the fixcrlf task deleted the temporary file and created a new one without said protection, effectively nullifying the effort. This would still allow an attacker to inject modified source files into the build process.
CVE-2020-5421 Medium · 6.5 Sep 19, 2020
RFD Protection Bypass via jsessionid
In Spring Framework versions 5.2.0 - 5.2.8, 5.1.0 - 5.1.17, 5.0.0 - 5.0.18, 4.3.0 - 4.3.28, and older unsupported versions, the protections against RFD attacks from CVE-2015-5211 may be bypassed depending on the browser used through the use of a jsessionid path parameter.
CVE-2020-11023 Medium · 6.1 KEV High · 67 Public exploit CWE-79 Apr 29, 2020
JQuery Cross-Site Scripting (XSS) Vulnerability
In jQuery versions greater than or equal to 1.0.3 and before 3.5.0, passing HTML containing <option> elements from untrusted sources - even after sanitizing it - to one of jQuery's DOM manipulation methods (i.e. .html(), .append(), and others) may execute untrusted code. This problem is patched in jQuery 3.5.0.
CVE-2019-10219 Medium · 6.1 CWE-79 Nov 8, 2019
Cross-site Scripting (XSS) in Red Hat Hibernate Validator
A vulnerability was found in Hibernate-Validator. The SafeHtml validator annotation fails to properly sanitize payloads consisting of potentially malicious code in HTML comments and instructions. This vulnerability can result in an XSS attack.
CVE-2019-17531 Critical · 9.8 CWE-502 Oct 12, 2019
Deserialization of Untrusted Data in Fasterxml Jackson-databind
A Polymorphic Typing issue was discovered in FasterXML jackson-databind 2.0.0 through 2.9.10. When Default Typing is enabled (either globally or for a specific property) for an externally exposed JSON endpoint and the service has the apache-log4j-extra (version 1.2.x) jar in the classpath, and an attacker can provide a JNDI service to access, it is possible to make the service execute a malicious payload.
CVE-2019-16943 Critical · 9.8 CWE-502 Oct 1, 2019
Deserialization of Untrusted Data in Fasterxml Jackson-databind
A Polymorphic Typing issue was discovered in FasterXML jackson-databind 2.0.0 through 2.9.10. When Default Typing is enabled (either globally or for a specific property) for an externally exposed JSON endpoint and the service has the p6spy (3.8.6) jar in the classpath, and an attacker can find an RMI service endpoint to access, it is possible to make the service execute a malicious payload. This issue exists because of com.p6spy.engine.spy.P6DataSource mishandling.
CVE-2019-16942 Critical · 9.8 CWE-502 Oct 1, 2019
Deserialization of Untrusted Data in Fasterxml Jackson-databind
A Polymorphic Typing issue was discovered in FasterXML jackson-databind 2.0.0 through 2.9.10. When Default Typing is enabled (either globally or for a specific property) for an externally exposed JSON endpoint and the service has the commons-dbcp (1.4) jar in the classpath, and an attacker can find an RMI service endpoint to access, it is possible to make the service execute a malicious payload. This issue exists because of org.apache.commons.dbcp.datasources.SharedPoolDataSource and org.apache.commons.dbcp.datasources.PerUserPoolDataSource mishandling.
CVE-2019-16335 Critical · 9.8 CWE-502 Sep 15, 2019
Deserialization of Untrusted Data in Fasterxml Jackson-databind
A Polymorphic Typing issue was discovered in FasterXML jackson-databind before 2.9.10. It is related to com.zaxxer.hikari.HikariDataSource. This is a different vulnerability than CVE-2019-14540.
CVE-2019-14540 Critical · 9.8 CWE-502 Sep 15, 2019
Deserialization of Untrusted Data in Fasterxml Jackson-databind
A Polymorphic Typing issue was discovered in FasterXML jackson-databind before 2.9.10. It is related to com.zaxxer.hikari.HikariConfig.
CVE-2019-10086 High · 7.3 CWE-502 Aug 20, 2019
Deserialization of Untrusted Data in Apache Software Foundation Commons Beanutils
In Apache Commons Beanutils 1.9.2, a special BeanIntrospector class was added which allows suppressing the ability for an attacker to access the classloader via the class property available on all Java objects. We, however were not using this by default characteristic of the PropertyUtilsBean.
CVE-2019-14439 High · 7.5 CWE-502 Jul 30, 2019
Deserialization of Untrusted Data in Fasterxml Jackson-databind
A Polymorphic Typing issue was discovered in FasterXML jackson-databind 2.x before 2.9.9.2. This occurs when Default Typing is enabled (either globally or for a specific property) for an externally exposed JSON endpoint and the service has the logback jar in the classpath.
CVE-2019-14379 Critical · 9.8 CWE-1321 Jul 29, 2019
Prototype Pollution in Fasterxml Jackson-databind
SubTypeValidator.java in FasterXML jackson-databind before 2.9.9.2 mishandles default typing when ehcache is used (because of net.sf.ehcache.transaction.manager.DefaultTransactionManagerLookup), leading to remote code execution.